Unilever Consumer Care Limited, a renowned industrial manufacturing company, sought to enhance its Horlicks manufacturing facility with advanced HVAC systems. Aiming to maintain product quality and freshness, Unilever faced several challenges, including adhering to multinational corporation (MNC) policies, operating with 110-volt electrical systems, and ensuring accurate system configuration. To address these complexities, Earnest collaborated with Unilever on a project titled “HVAC Systems for Horlicks Manufacturing Facility.”


Challenge

Unilever needed an advanced HVAC system for their Horlicks facility to maintain product quality and freshness. Challenges included adhering to MNC policies, operating with 110-volt electrical systems, and ensuring correct system configuration.

Solutions

To address the challenges of the project, Earnest’s team conducted site visits, prepared a bill of quantities, calculated product capacity, implemented PLC-based control systems, and worked closely with Unilever to meet their specifications. Ultimately, the project was completed successfully.

The Installation

Earnest put in a new central air conditioning system at the Horlicks factory to keep the temperature and humidity just right. The system uses PLC-based controls to make sure it works perfectly. They followed Unilever’s safety and operational standards every step of the way. Even though the 110-volt elements were a challenge, they got the system up and running without interrupting anything else that was going on at the factory.


Advanced Technologies and Unique Features

The heating and cooling system had this fancy PLC-based controlling thing that kept the temperature and humidity just right for the factory. It was like a smart thermostat that could change on its own to match the weather outside. This was super important because Horlicks products needed a specific environment to stay fresh and tasty during production. The system also worked with the factory’s 110-volt power, so it fit in perfectly.

Main Achievement

The project’s biggest win was getting a central air conditioning system up and running that met Unilever’s strict quality standards. It wasn’t easy, though. Earnest had to follow MNC policies and work with a 110-volt system. But they got it done on time, and production kept going without a hitch. The PLC-based system they used gave total control over the environment, which made the manufacturing process more efficient and ensured that the products were top-notch.

The Benefits

The fancy new HVAC system brought a bunch of good stuff to Unilever’s Horlicks factory. It kept the temperature and humidity just right, which meant the products stayed fresh and tasty throughout the whole production process. The system was also really efficient, thanks to the PLC-based control system. This helped the factory meet its production goals without worrying about the products going bad. To top it all off, the project’s success showed that the company is committed to doing things the right way and being the best at what they do.

Conclusion

The HVAC project for Unilever Consumer Care Limited demonstrated Earnest’s ability to deliver customized air conditioning solutions in a complex industrial environment. By overcoming challenges related to MNC policies and electrical configurations, the project provided Unilever with an advanced, reliable system that ensured product quality and operational efficiency.